long-term rectification of morth identified blackspots by 1). construction of lvup at km.370+780 at koudiyal cross [ka-(02)-069], (2). construction of fob at km.372+200 at engg college [ka-(04)- 192], (3). construction of lvup at km.390+728 at ram & raj college [ka- (02)-515], (4). construction of vup at km.415+380 at manna-e-khelli entrance [ka-(03)-234], (5). construction of lvup at km.455+586 at digwal village [tg- (02)-107] and (6). construction of lvup at km.473+873 at aroor village [tg-(02)- 016] under the project: maharashtra/karnataka border – sangareddy section of nh-65 (old nh-9) from km.352.188 to km.497.174 in the state of karnataka and telangana on epc mode
|